Kitchen Renovation Order of Work: What We Learned in Our 1994 Kitchen Remodel
Home / Journal

Kitchen Renovation Order of Work: What We Learned in Our 1994 Kitchen Remodel

If you are trying to map the kitchen renovation order of work, I learned the hard way that the sequence matters more than the fancy tile. We remodeled our 1994 Salt Lake City kitchen on a mid-budget plan, tracked every receipt in a Google Sheet, and discovered that a kitchen is not one project. It is a chain of small jobs that all depend on each other. Get the order wrong and you pay for it twice, usually with dust in your hair and a cabinet guy standing there waiting for a wall to be finished.

Our total came in at about $27,700 before a few last-minute odds and ends, which felt pretty normal for a full refresh with cabinet replacement, quartz, new flooring, and updated electrical. The big lesson was simple: the work goes faster when you treat it like a schedule, not a pile of trades.

Start with demo, measurements, and the ugly surprises

The kitchen renovation order of work starts with demo only after you know what is staying. I spent one Saturday labeling outlets, taking photos of every shutoff valve, and writing dimensions in my renovation notebook before we touched a single cabinet screw. That sounds obsessive until you realize how easy it is to forget where the water line was once the old sink is gone.

Demo itself cost us $640, mostly for the dumpster and a few hardware-store runs for blades, masks, and floor protection. The messy part was not the demo; it was what demo uncovered. We found a soft spot in the subfloor near the dishwasher and a crooked wall behind the fridge cabinet. Neither was catastrophic, but both would have been much worse if we had ordered cabinets first and hoped for the best.

I also learned not to rush the “small” prep jobs. If you are moving plumbing, adding outlets, or changing the appliance layout, those decisions belong here, not after the drywall is up. This is the phase where a couple of extra hours can save a week later.

Rough-ins before anything gets covered back up

The kitchen renovation order of work gets expensive when rough-ins are out of sequence. We brought in an electrician first because the old kitchen had too few circuits for a modern fridge, microwave, dishwasher, and the under-cabinet lighting Megan wanted. The electrical work ran about $1,850, including a few new outlets, a dedicated dishwasher circuit, and moving one outlet so the range would sit flush.

Plumbing came next at roughly $1,240. We kept the sink in the same general spot, which saved money, but we still had the drain and supply lines adjusted for the new base cabinet layout. That is the kind of choice that sounds boring and saves real money. Moving a sink six feet across the room would have added a lot more labor and probably a few more headaches.

The key here is not to close anything up too early. Once the rough-ins are approved and tested, then you can move on with confidence. Before that, every shortcut becomes a future repair bill.

Illustration for kitchen renovation order of work

Drywall, flooring, and paint are the quiet part that still matters

This is the stretch where people get impatient because the kitchen still looks broken, but this is also where the finish quality starts. We spent about $1,430 on drywall repair, patching, and texture to smooth out the walls after the old backsplash and cabinet run came out. It was not glamorous, but new cabinets look cheap against bad walls.

Flooring depends on what you choose. We used a durable LVP that needed a flat substrate and a clean transition into the adjacent hall, so we handled floor prep before the cabinets went in. That decision made our installer happier and kept the final height predictable at the doorway. If you are using tile, engineered wood, or another material, plan the sequence carefully with your installer and appliances in hand. The finished floor height affects toe kicks, dishwasher clearance, and whether the fridge door opens without scraping.

Paint came last in this phase because we wanted the repaired walls sealed before the cabinet crew showed up. It is easier to paint a mostly empty room than to tape around installed boxes and hardware.

Cabinets and counters are where the room finally becomes a kitchen

Cabinets were the biggest line item by a mile at about $7,900, and this is where the kitchen renovation order of work really shows its value. We used an IKEA cabinet system with upgraded fronts, which gave us a decent balance of cost and flexibility. The install took longer than I expected because the room was not square. One wall bowed enough that the installer needed extra filler work, and I paid about $320 to replace a panel and a trim piece after I mismeasured the refrigerator opening. That was an expensive reminder that “close enough” is not a measurement system.

Countertops came after the cabinet boxes were set and leveled, not before. Our quartz slab, including fabrication and install, ran about $3,600. The template visit happened only after the cabinet layout was final, which is exactly how it should go. If you change cabinet heights or swap a sink base after that point, you are buying yourself a second trip and a new headache.

By the time the counters were on, the room finally looked real. Until then, it was mostly boxes and decisions.

Visual context for kitchen renovation order of work

Backsplash, appliances, hardware, and the final hookups

This is the part that looks fast from the outside and somehow still takes forever. Our backsplash landed at about $1,100 for tile, grout, and labor, and it had to wait until the counters were in. That is non-negotiable if you want clean lines where the countertop meets the wall. After that came the faucet, sink, disposal, range, dishwasher, and the little details that make the room usable again.

Appliance delivery is another place where order matters. We had the fridge scheduled after the counters were installed because we needed the final opening confirmed. Same with the dishwasher. I would have hated to discover a clearance problem after the installer had already gone home. Hardware, outlet covers, caulk, and touch-up paint are not exciting, but they are what separate “almost done” from actually done.

This stage also revealed how many tiny jobs hide inside one big remodel. A loose switch plate, a crooked toe kick, and one missing trim strip can all make a finished room feel unfinished.

The sequence I would use again without changing a thing

If I had to do it over, I would keep the same rough flow: measure, demo, rough-ins, wall repair, floor prep, cabinets, counters, backsplash, then final fixtures and punch list. That is the kitchen renovation order of work that kept us from stepping on our own toes. The order does not make the project easy, but it does keep the project honest.

My biggest mistake was assuming I could make one or two late decisions without costing time. I could not. Every late change pushed something else back, and every delay had a dollar amount attached to it. The good news is that a clear sequence gives you leverage. It helps you spot which decisions are expensive, which ones are reversible, and which ones need to be locked before anyone opens a toolbox.

If you are planning your own remodel, write the sequence down before you price the tile. That is the cheapest part of the whole job, and it probably matters more than the backsplash color. Measure twice, cook once.

Ready to talk about your own home?

Book a free site visit — our designer will give you advice based on your actual space.

Book a Free Site Visit
Back to Home

Keep Reading

Resident Letters

0 letters

No letters yet — be the first to write one.

Leave a Letter